Space the fasteners a maximum of 16 406mm apart for horizontal siding panels every 12 305mm for vertical siding panels and every 8 to 12 203mm to 305mm for accessories.
How often should i snap a line for horizontal siding. Install undersill trim the width of the window flush to the casing. The resulting raised lugs should face outward and will snap into undersill trim. The tool is available at most hardware stores and usually costs less than 10. Using the same process for steel siding.
Cutting siding around window. The low end is about 3 00 per square foot up to 6 00 per square foot for the thicker top of the line siding. Below the cut edge at 6 in. Furring may be necessary to maintain proper pitch of the siding.
If you re noticing a lot of external wear and thinking you should grab some paint and a brush check to see if there s any warping or cracking in the siding. Cost ranges between 4 00 and 8 00. There s a paradox inherent to exterior siding. The top piece of j channel must have minimum 3 16 4 8mm diameter weep holes drilled no more than 24 610mm apart to allow for water runoff and the starter strip j channel should not rest on.
Choosing horizontal over vertical siding. While this may seem like regular home upkeep your siding should be able to retain its color for 8 to 10 years. How to install vertical siding and how it varies from horizontal panel installation. With horizontal metal siding whether you want a traditional or modern look is no longer applicable to.
So 4 00 x 304sq ft. If finished in aluminum siding. Finish the last course of horizontal siding with the j channel and finish trim or double finish trim. On the other the very elements it s designed to.
Install the siding panel making sure the lugs from the snap lock punch lock into the utility trim. Install head flashing and a j channel. For more information refer to page 25 of the vsi vinyl siding installation manual. On the one hand siding serves as your home s first line of defense against the elements.
It s a shed so 3 00 x 304sq ft. These distances may be increased if the manufacturer permits greater spacing based on wind load testing. Using the snap lock punch punch the panel 1 4 in.