How Do You Install A Cedar Shingle Roof

Install shingles as normal up to the base of the plumbing vent.
How do you install a cedar shingle roof. Ensure the second shingle overhangs the edge of the roof by the same amount as the first shingle. The top ridge cap shingles will overlap the hip ridge cap so start with the hips. Put the next shingle about one eighth to one quarter of an inch away from the edge of the first shingle. Installing cedar roofing shingles yourself can be done when you prepare for all the steps ahead of time.
Protect your new cedar roof by avoiding these mistakes as you plan your install. Once all your shingles are installed you ll need to cover cap the ridge and hip ridges if you have a hip roof. A newly installed shake roof is bright blond with a. How to install roofing shakes.
A good rule of thumb is getting 10 percent more than you need just in case you need more material. Attach the shingle to the roof with two nails driven in near its top edge. Begin by calculating the number of shingles you ll need. Here is how you do it.
Cedar roofing is a beautiful material but it can be tricky to work with. Installing cedar shingles on the wall isn t a difficult process. Trim any thin edges sticking past the roof. Roofing shakes are typically cut from red cedar which resists damage and deterioration from water and insects.
The rustic all natural wood expands and contracts depending on the season and is susceptible to water damage if proper precautions aren t taken. Measure out the square footage of the roof to make sure you have enough wood. Place the flashing or boot onto the plumbing vent so the base is resting on shingles. Check the rest of the roof installation to ensure the cedar shakes or shingles laid on the roof up to the ridge are properly installed in straight rows.
Installing a roof plumbing vent is typically an easier task than flashing a chimney. Maintain the broken bond pattern throughout the roof and ensure a 5mm gap is left between each cedar shingle. Snap a couple of guide lines just a little inside the perimeter of the ridge so the lines get covered up when you re done. Momentarily lift the boot and apply sealant to hold the flashing in.
Ridges see our available ridges here when you reach the ridgeline you will need to cut the shingles to maintain the 125mm gauge the shingles can be cut with a hand saw or by using a stanley blade to score them.