Cut a 1 inch notch on either end of the piece with tin snips but do not score or snap the.
How do you finish the top siding. Choose real wood siding for the most authentic appearance or vinyl or hardboard siding for lower maintenance and a more durable finish. Create the top piece by cutting a length of j molding 2 inches longer than the width of the window. Push the top of the vinyl siding with the tabs into the utility trim just enough to hold the edge and push the bottom against the second to last piece of siding. At the bottoms of windows install under sill trim for horizontal siding and j channel trim for vertical siding.
For vertical siding install j channel trim. Keeping siding straight and level. When you reach the top row of siding you will need to measure and cut it to fit. For horizontal siding install f channel trim at the soffit and gable rake.
Push up gently until you hear a click. Screw the siding panels into the exposed icf using corrosion resistant screws such as galvanized or stainless steel screws. If you have to cut the top row of siding then use j channel at the top instead of utility trim. Don t forget to include the radius of the screw or nail head when considering maximum space from the edge.
Once it is in place test by sliding the last piece back and forth slightly. Some adjustment may be needed to complete installation of the top row of siding. Without an additional layer of siding to cover it as it touches the soffit installers must take extra steps to give the siding job a finished look. If you re installing the panels yourself you ll likely be fine.
You must leave the bottom edge of the vinyl intact so that it can be secured into the row of vinyl siding below it. For more information refer to page 16 of the vsi vinyl siding installation manual. If the top is mitered miter the sides as well. I had no problem keeping the nails to pretty close to 0 5 from the edge.
Cover the walls in wood vinyl or hardboard siding for a classic timber look. Step 1 measure the gap remaining at the top of the wall. Install the top row of siding. Be sure the top and bottom click into place.
Nail every 12 inches on center. Install trim under eaves rakes. Two screws about 1 1 8 on centre require at least 1 3 8 to cover. To keep this last cut row from collapsing against the house nail a 3 in.
Keep in mind siding is only as straight and stable as what lies under it. It should move smoothly. Step 2 mark the length of vinyl where the cut needs to be made to achieve the correct fit.