How Do I Attach 2x4 To Sheet Metal Studs

Make sure the side of the drywall sheet is against the adjacent wall and the opposite edge is running upward along the center of a metal stud.
How do i attach 2x4 to sheet metal studs. Choose one end left or right of the wall to begin hanging drywall sheets. The existing metal studs are on the exterior wall of a commercial building and are already drywalled in. 3 625 in w x 120 in l x 1 25 in d prostud 3 5 8 25 ga galvanized steel metal stud. You should typically allow for 1 stud per every 12 inches 300 mm of linear wall space.
Determine the number of steel studs needed. I would probably suggest 2 1 2 fine thread drywall screws. The fine threads are made to hold into metal studs and also have a sharp point to pierce the metal. Either way a bit of construction adhesive behind the 2x4 would probably be advisable if you never want it to come off.
To cut individual steel studs and tracks use straight cut aviation snips photo 1. Add an additional stud for each side of a window or door. Purchase steel plates also called tracks for the bottom and top of the wall by measuring the linear feet of the wall and doubling it. Item 15418 model 139495.
Studs are specifically installed.